Skip to content
Technical Authority Hub

Stop losing sales
to council red tape.

We transform your modular container imports into fully-mapped, Australian Class 1a Compliance Packs ready for the PCA, your council, and private certifier.

The Import Problem.

The Australian market is saturated with imported expandable container units, yet most fail at the point of approval. Generic factory drawings are routinely rejected by councils and private certifiers because they do not align with local regulatory frameworks.

Without proper integration into the Australian compliance pathway, these structures are not recognised as habitable buildings — they remain classified as non-compliant prefabricated units.

Common Rejection Reasons

  • No RPEQ Structural Sign-OffFactory drawings are not signed by an Australian Registered Professional Engineer (RPEQ/CPEng). Councils require Form 15 (design) and Form 16 (inspection) from a locally licensed engineer — generic overseas certifications are rejected outright.
  • EPS Panels are B2 CombustibleStandard factory EPS sandwich panels are classified B2 under Chinese GB standards — combustible. Australian NCC 2022 Deemed-to-Satisfy provisions for Class 1a habitable buildings require non-combustible (A1) materials or a fire engineered Performance Solution.
  • Wind Classification Not AU-MappedChinese factory drawings use local GB 50009 wind load tables. Australia uses AS/NZS 1170.2 wind classifications (N1–N6 / C1–C4 for cyclone zones). Without re-engineering to AU wind maps the structure cannot be certified.
  • Missing NatHERS Energy ReportNCC 2022 mandates a 7-star NatHERS rating for Class 1a dwellings. Factory spec sheets do not include AU thermal performance modelling — a licensed NatHERS assessor must produce this independently, which adds $600–$900 when sourced separately.
  • No CDC/SEPP Compliance MappingFor the NSW CDC fast-track pathway, drawings must demonstrate compliance with SEPP Housing 2021 — setbacks, height limits, and floor space ratio. Chinese factory documentation contains none of this.
Tier 4 — Full Resolution

The Keaton Mills Solution

We take your exact unit footprint and resolve every rejection point above into a single, professionally engineered, council-ready compliance pack.

  • RPEQ/CPEng structural sign-off + Q235B/Q355B steel equivalence cert
  • Rock Wool A1 panel upgrade or fire Performance Solution
  • AS/NZS 1170.2 wind reclassification to your site postcode
  • NatHERS 7-star thermal assessment included
  • SEPP Housing 2021 + CDC compliance mapping (NSW)
  • QLD Form 15 / Form 16 design + inspection coordination
  • Private certifier liaison and council lodgement management
View Tier 4 Package →

Compliance Packages

Tiered engineering packages for modular resellers, international importers, and Australian developers.

Tier 1

Vision Lock

Perfect for marketing, initial client conceptualisation, and investor decks.

AUD$817
Delivery: 3–5 business days
  • High-Resolution 2D Floor Plans
  • Full Elevation Set (Front, Rear, Both Sides)
  • Room & Fixture Dimensioning
  • PDF Presentation-Ready Format
  • Engineering / Services Drawings
  • Australian Standards References
  • Council Submission Ready
Secure Scoped Pricing
EST. DELIVERY: 3–5 business days
Most Popular
Tier 2

Preliminary Engineering

The standard package required by most consulting engineers and importers.

AUD$1,932
Delivery: 7–10 business days
  • Everything in Tier 1
  • Plumbing Routing (AS 3500 compliant)
  • Electrical & DB Plans (AS 3000 compliant)
  • Sectional Framing & EPS Wall Details
  • Full Bill of Quantities (BOQ)
  • Pier & Footing Placement Guide
  • Council Submission Ready
Secure Scoped Pricing
EST. DELIVERY: 7–10 business days
Best Value
Tier 3

Council Submission Pack

The ironclad pack for PCA and Council DA/CDC approvals. Professionally engineered.

AUD$3,312
Delivery: 10–14 business days
  • Everything in Tier 2
  • Class 1a Structural Translation
  • NatHERS Thermal Mapping Baselines
  • AS 3959 Bushfire Attack Level (BAL) Details
  • AS 3740 Waterproofing Provisions
  • Import / SEPP Compliance Pathway Form
  • Council Submission Ready
Secure Scoped Pricing
EST. DELIVERY: 10–14 business days
Full Service
Tier 4

Full Project Management

We handle everything. From factory drawings to approved DA. You just receive the keys.

AUD$6,889
Delivery: 3–6 weeks
  • Everything in Tier 3
  • RPEQ / Structural Engineer Sign-Off (Form 15/16)
  • Geotechnical Soil Test Coordination
  • Private Certifier Liaison & Fee Management
  • Council Lodgement Submission
  • Site Inspection Coordination
  • Dedicated Account Manager
Secure Scoped Pricing
EST. DELIVERY: 3–6 weeks

Independent Australian engineering sign-off and council certification typically costs $2,800–$7,500 when sourced separately (private certifier, RPEQ engineer, council fees, soil testing). Our Tier 4 package bundles all of this at a managed, fixed rate with a single point of contact.

How It Works

From factory images to council-approved documents in weeks, not months.

01

Raw Intake

Send us your factory images, 6×6 floor sketches, or any existing documentation. No CAD files required.

02

Standards Mapping

Our engineers map your build against NCC 2022, AS/NZS codes, and isolate EPS fire/electrical risks.

03

Drafting & Review

We produce millimetre-perfect layout documentation. One revision round is included in all tiers.

04

Delivery & Support

You receive a hyper-detailed PDF pack. Tiers 3 & 4 include engineer sign-off and council lodgement.

Partner With Us

Stop guessing with council submissions. Tell us about your import volume and we'll respond within 24 hours with a scoped quote.

Response within 24 business hours. Payments accepted via Stripe, PayPal, Bank Transfer, or Crypto.